WBS (Work Breakdown Structure)

WBS (Work Breakdown Structure)

A Work Breakdown Structure (WBS) is a hierarchal, breakdown of the project into lower level, manageable tasks, or deliverables. It forms the basis for estimating, costing, and scheduling. For a well-managed project, every cost estimate, schedule entry, and progress update ties to a node within the WBS.